Blog Layout

The Mezzanine Lakes Wall at MSP Airport Glazing Project Captures the Essence of Minnesota's Lakes

The Mezzanine Lakes Wall at MSP Airport Glazing Project Captures the Essence of Minnesota's Lakes w l hall company 1

One of the standout features of the Lakes Wall is its glazing, supplied by the renowned Forms and Surfaces. This glazing captures the essence of Minnesota's lakes, with digital prints showcasing the topographical contours of some of the state's picturesque bodies of water.๏ปฟ

The Mezzanine Lakes Wall at MSP Airport Glazing Project Captures the Essence of Minnesota's Lakes w l hall company 2

 It's a stunning blend of artistry and functionality that adds a unique and aesthetically pleasing touch to the airport environment.

The Mezzanine Lakes Wall at MSP Airport Glazing Project Captures the Essence of Minnesota's Lakes w l hall company 3

We collaborated with our friends at Alliance Architects (Minneapolis) and Morcon Construction (Fridley, MN), which played integral roles in the successful completion of the comprehensive four-phase BCTL project spanning the years 2019, 2021, 2022, and 2023.

The Mezzanine Lakes Wall at MSP Airport Glazing Project Captures the Essence of Minnesota's Lakes w l hall company 4

Their collaborative efforts and expertise were seamlessly woven into each phase, showcasing a sustained commitment to excellence and innovation.

The Mezzanine Lakes Wall at MSP Airport Glazing Project Captures the Essence of Minnesota's Lakes w l hall company 5

One of the standout features of the Lakes Wall is its glazing, supplied by the renowned Forms and Surfaces. This glazing captures the essence of Minnesota's lakes, with digital prints showcasing the topographical contours of some of the state's picturesque bodies of water.


 It's a stunning blend of artistry and functionality that adds a unique and aesthetically pleasing touch to the airport environment. We collaborated with our friends at Alliance Architects (Minneapolis) and Morcon Construction (Fridley, MN), which played integral roles in the successful completion of the comprehensive four-phase BCTL project spanning the years 2019, 2021, 2022, and 2023.


Their collaborative efforts and expertise were seamlessly woven into each phase, showcasing a sustained commitment to excellence and innovation.

The Mezzanine Lakes Wall at MSP Airport Glazing Project Captures the Essence of Minnesota's Lakes w l hall company 6

The Mezzanine Lakes Wall at MSP Airport is a testament to precision and craftsmanship. Crafted with precision, the wall is constructed using solid radiused steel bars meticulously supplied by BPS Incorporated. These bars are expertly welded into place, enhancing the structural integrity of the entire installation.


We also installed an exquisite railing system that needed to follow an elliptical floor plate, that included a handrail that required following the elliptical shape, and have 1” thick tempered laminated glass act as pickets. These glass pickets were narrow and had a complex geometric shape.๏ปฟ

Click on the image below (W. L. Hall Company eFlipBook) to discover our wide-ranging portfolio of collaborative projects.

The Mezzanine Lakes Wall at MSP Airport Glazing Project Captures the Essence of Minnesota's Lakes w l hall company 7
The Mezzanine Lakes Wall at MSP Airport Glazing Project Captures the Essence of Minnesota's Lakes w l hall company 8
By Ira Hackner 18 Apr, 2024
Skyfold Mirage for Magnifi Financial's Maple Grove New Branch Office
By Ira Hackner 10 Apr, 2024
Orthopaedic Hospital of Wisconsin (OHOW) Center at UW-Milwaukee Kalwall Translucent Panel System
By Ira Hackner 02 Apr, 2024
W. L. Hall Company | Window Renovation Project Spotlights
By Ira Hackner 21 Mar, 2024
Tartan High School (Oakdale, MN) | Effortless space reconfiguration for the school's four multipurpose rooms
W. L. Hall Company 2024 MOD Rate is at our all-time low of 0.60
By Ira Hackner 18 Mar, 2024
W. L. Hall Company 2024 MOD Rate is at our all-time low of 0.60
By Ira Hackner 12 Mar, 2024
Hazelden Betty Ford Foundation Facility (Center City, MN) New Wood Curtainwall System Project
By Ira Hackner 05 Mar, 2024
Women in Construction Week Spotlight - March 3 - 9, 2024 Heather Isaacson | Head of Engineering ๏ปฟ W. L. Hall Company
By Ira Hackner 29 Feb, 2024
Abbott Northwestern Hospital (Minneapolis) Central Utility Plant (CUP) - | Glass & Glazing (EFCO) | Security & Climate Control (McKeon)
By Ira Hackner 22 Feb, 2024
4Marq Apartments (Minneapolis) | High-Performance and Cost-Effective Window Systems that Produce Amazing Views
By Ira Hackner 15 Feb, 2024
Hopkins Senior High & West Junior High Schools Utilize ZONA & Modernfold Glass Walls for Collaborative, Safe and Flexible Learning Environments
More Posts
Share by: