Blog Layout

McKEON Fire Door & Curtain Protection for the New Carbon 31 Luxury Apartments (Bloomington, MN)

w l hall company mckeon door for carbon 31 luxury apartments 1

Carbon 31 is a new active lifestyle apartment community in Bloomington's South Loop District, where upscale meets nature, offering luxury and sophistication.

w l hall company mckeon door for carbon 31 luxury apartments 3

Carbon 31 had specific needs regarding fire safety and security. It was important for building occupants to be able to see inside an area before they entered. If that opening was part of a fire wall, the door would have to be either solid or have only a limited amount of glass. By using McKeon fire rated products directly adjacent to these openings, our esteemed partners, ESG Architecture and Design and McGough Construction could use full glass doors providing maximum visibility.


Where overhead space was not a problem, a McKeon coiling fire shutter was used. Where headspace was limited, a McKeon D200 fire rated curtain was used. Lastly, were a limited amount of egress was required, a McKeon D200E was used to allow a limited number of occupants to egress out of the space. All McKeon D200 systems have a UL 10D rating for up to 3 hours and a UL 1784 rating for smoke and draft resistance.

w l hall company mckeon door for carbon 31 luxury apartments 2

The next time you are trying to balance the requirements for fire protection, smoke containment, security, and access control on a project, call W. L. Hall Company to find out how are wide variety of code compliant products can help.


Click on the image below (W. L. Hall Company eFlipBook) to discover our wide-ranging portfolio of collaborative projects.

Click on the image below (W. L. Hall Company eFlipBook) to discover our wide-ranging portfolio of collaborative projects.
By Ira Hackner December 11, 2024
Marlite® Sieva™ delivers a unique and visually striking design for the multi-purpose room at Irondale High School.
By Ira Hackner December 5, 2024
Kalwall Illuminated Translucent Canopies for the Mayo Clinic St. Mary's Mary Brigh Building
By Ira hackner November 25, 2024
Skyfold Acoustic Vertical Folding Retractable Walls for Minnesota State Offices Is Skyfold the "Unofficial" Operable Wall of the State of MN?
By Ira Hackner November 14, 2024
Open up your designs with wide-span opening protectives from McKEON
By Ira Hackner November 6, 2024
Modernfold's Purview Operable Wall for Virtual Radiologic Telerad Services (vRad) Edina Boardroom Fals ๏ปฟ e Muntins Yield Positive Results
By Ira Hackner October 31, 2024
The RiverCentre (St. Paul) and Bell Bank (Fargo) projects in 2024 demonstrate the unique transformative benefits of Kalwall translucent panel systems in high-volume spaces.
By Ira Hackner October 23, 2024
Kalwall protects and serves the citizens of Pleasant Prairie, WI
By Ira Hackner October 14, 2024
Minnesota State University - Moorhead Christianson Alumni Center
By Ira Hackner October 3, 2024
St. Francis Tria (Shakopee, MN) Project
By Ira Hackner September 19, 2024
Renovation Projects for Hilleboe Hall and Kittelsby Hall at St. Olaf College
More Posts
Share by: